Implementation Of Production Schedule Board To Decide Standard Production Time In Manufacturing Industry (Case Study: Asia Roofing Industries Sdn Bhd)

Tan, Kui Siong (2010) Implementation Of Production Schedule Board To Decide Standard Production Time In Manufacturing Industry (Case Study: Asia Roofing Industries Sdn Bhd). Project Report. UTeM, Melaka, Malaysia. (Submitted)

[img] PDF (24 pages)
Implementation_Of_Production_Schedule_Board_To_Decide_Standard_Production_Time_In_Manufacturing_Industry_-_24_pages.pdf

Download (406kB)
[img] PDF
Implementation_Of_Production_Schedule_Board_To_Decide_Standard_Production_Time_In_Manufacturing_Industry_-_Full_Text.pdf
Restricted to Registered users only

Download (2MB)

Abstract

Manufacturing industry is always a challenging area because of the unpredictable uncertainties and obstacles that might occur anytime throughout the operation. For a company to maintain a profitable growth from time-to-time, different approaches in reducing its operation cost while improving the product quality, operation efficiency,and overall control must be taken to avoid its market share being dominated by the competitors. Those approaches raised the demand of new and evolved management systems and production scheduling system is one of the management tool that been widely used in manufacturing industries and has been proven its capabilities and effectiveness through many success histories. The approach of this project is to implement a production scheduling board on a roof manufacturing company that start seeing the advantages of implementing a production scheduling system on their production floor. The implementation process is comprised of few stages, where each of the stage will be carried out according to the right sequence. The company current production flow was analyzed in order to find out the optimum production time that plays a critical role in deciding the functional ability and reliability of the proposed scheduling board. Throughout the analysis process, modifications on implemented scheduling board were identified so that the system is improved and adopted according to the circumstances. The final output of this project is that the implementation of production scheduling system shows positive and encouraged improvement based on the data collected and compared with data before the implementation where significant time were saved by using the scheduling method in managing flow of processes and orders. At the end of this project, an electronic version of scheduling board is constructed based on Microsoft Excel due the problem raised and suggestions given and finally recommendations were suggested to further improve the system and the overall process of this project.

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Production scheduling -- Mathematical models, Production scheduling, Production planning
Subjects: T Technology > T Technology (General)
T Technology > TS Manufactures
Divisions: Library > Final Year Project > FKP
Depositing User: Rohana Hashim
Date Deposited: 01 Aug 2012 00:30
Last Modified: 28 May 2015 03:30
URI: http://digitalcollection.utem.edu.my/id/eprint/4999

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year