Mar'emazairy , Omar (2007) The Implementation Of Total Productive Maintenance (TPM) At High Volume Company. Project Report. UTeM, Melaka, Malaysia. (Submitted)
![]() |
PDF (24 Pages)
The_Implementation_Of_Total_Productive_Maintenance_(TPM)_At_High_Volume_Company_-_24_pages.pdf - Submitted Version Download (211kB) |
![]() |
PDF (Full Text)
The_Implementation_Of_Total_Productive_Maintenance_(TPM)_At_High_Volume_Company.pdf - Submitted Version Restricted to Registered users only Download (4MB) |
Abstract
This report is provided to explain the result of study on Total Productive Maintenance (TPM) implementation at high volume company. The company is Continental Sime Tyres (CST) which located at Alor Star, Kedah. This study covers the challenges, benefits, limitations and any related issue that occurred in TPM implementation. The data was obtained from several methodologies included observation, interview and group discussion. In addition questionnaire survey was distributed to selected employee which involved in TPM implementation. The data was analyzed by using Statistical Package for the Social Science (SPSS) programming. The result was showed that there are some issues of the TPM implementation and need to be highlighted toward successful TPM implementation.
Item Type: | Final Year Project (Project Report) |
---|---|
Uncontrolled Keywords: | Plant maintenance -- Management, Total productive maintenance |
Subjects: | T Technology > T Technology (General) T Technology > TS Manufactures |
Divisions: | Library > Final Year Project > FKP |
Depositing User: | Nor Ridzuan S.Kasehan |
Date Deposited: | 25 Apr 2013 01:57 |
Last Modified: | 28 May 2015 03:49 |
URI: | http://digitalcollection.utem.edu.my/id/eprint/7403 |
Actions (login required)
![]() |
View Item |