Browse By Repository:

 
 
 
   

Development of new standard operation procedure configuration for disassembly work

Boo, Jia Min (2018) Development of new standard operation procedure configuration for disassembly work. Project Report. Universiti Teknikal Malaysia Melaka, Melaka, Malaysia. (Submitted)

[img] Text (24 Pages)
Development Of New Standard Operation Procedure Configuration For Disassembly Work.pdf - Submitted Version

Download (158kB)
[img] Text (Full Text)
Development of new standard operation procedure configuration for disassembly work.pdf - Submitted Version
Restricted to Repository staff only

Download (12MB)

Abstract

Standard Operating Procedure (SOPs) is a vital component in any quality operation system. Written instructions on standardized processes provide guidance to ensure that activities are conducted in a proper way, hence leading to reliable product and service quality. SOPs should be prepared in full compliance with guidelines and regulations as well as must upload current organizational practices. However, traditional printed paper based SOP is a fully manual in application in which it can deliver some disadvantages and limitations to users. Therefore, the purpose to come out with this project is to develop semi-automated SOP that is in digital based to replace traditional SOP which to eliminate the limitations of printed paper based SOP. This report also included the technique that required to approach the aim of this project. There have two product are chosen as the model for disassembly work which are extension trailing socket and landline telephone, then prepare the printed paper based SOP once know the disassembly sequences and the components that contain in the products. Moreover, the disassembly steps will be perform in proposed digital based SOP which developed by using Microsoft Power Point due to cost and convenient factor. After propose a new SOP configuration, a series of data collection are conducted with thirty participants to perform the disassembly work and analyses are conducted to analyse it performance. The performance is analyse by using the time taken to complete the disassembly work. Thus, the result basically shows the comparison about the performance of disassembly between the printed paper based SOP and proposed digital based SOP. In additional, the result also analyse the achievement of disassembly work by using different hand tools which are manual screwdriver and semi-automated screwdriver. In short the result shows that the digital based SOP able to help in disassembly work by reduce the overall time required by 15% for extension trailing socket and 26% for landline telephone.

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Manufacturing processes, Process control, Data processing, Production control data processing
Subjects: T Technology > T Technology (General)
T Technology > TS Manufactures
Divisions: Library > Final Year Project > FKP
Depositing User: Mohd Hannif Jamaludin
Date Deposited: 23 Sep 2019 07:54
Last Modified: 19 Dec 2023 01:29
URI: http://digitalcollection.utem.edu.my/id/eprint/23478

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year