Browse By Repository:

 
 
 
   

An Analysis Of Jig Designs To Assembly Time In Plug Assembly Line Using Design Of Experiment

Shee, Chee Shen (2008) An Analysis Of Jig Designs To Assembly Time In Plug Assembly Line Using Design Of Experiment. Project Report. UTeM, Melaka, Malaysia. (Submitted)

[img] PDF (24 Pages)
An_Analysis_Of_Jig_Designs_To_Assembly_Time_In_Plug_Assembly_Line_Using_Design_Of_Experiment_-_Shee_Chee_Shen_-_TJ1185.S53_2008_24_Pages.pdf - Submitted Version

Download (521kB)
[img] PDF (Full Text)
An_Analysis_Of_Jig_Designs_To_Assembly_Time_In_Plug_Assembly_Line_Using_Design_Of_Experiment_-_Shee_Chee_Shen_-_TJ1185.S53_2008.pdf - Submitted Version
Restricted to Registered users only

Download (4MB)

Abstract

This research has developed some jig designs for plug assembly line. The design is based on number plugs per jig (3 or 4), orientation of jig design (vertical or horizontal) and screwing process (no flip or flip). To find the most efficient design of jig, an experiment has been conducted based on Design of Experiment. Design of experiment 24 with two levels of each factor is used. Two subjects were employed to conduct the plug assembly experiment. 36 experiments for each level of factors were conducted and each subject conducted total 288 for 8 different sets of combination factor. With using Analysis of Variance (ANOVA) the most efficient design were identified. The results shows that number plug per jig in this research have most significant effect to the assembly time. Orientations of jig design and screwing process also show have significant effect to assembly time. Interaction combinations of two and three factors do not show any significant effect to assembly time. The most productive with lowest assembly time achieved at factors: number plugs per jig are 4, orientation of jig design is vertical and screwing process is flip.

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Jigs and fixtures -- Design and construction, Metal-cutting tools -- Design and construction
Subjects: T Technology > T Technology (General)
T Technology > TJ Mechanical engineering and machinery
Divisions: Library > Final Year Project > FKP
Depositing User: Nooraidillah Rasdi
Date Deposited: 12 Apr 2012 12:50
Last Modified: 28 May 2015 02:27
URI: http://digitalcollection.utem.edu.my/id/eprint/2093

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year