Browse By Repository:

 
 
 
   

Productivity Improvement By Using Line Balancing Technique Case Study At An Electronic Company

Zhafran Aizat , Zakaria (2007) Productivity Improvement By Using Line Balancing Technique Case Study At An Electronic Company. Project Report. UTeM, Melaka, Malaysia. (Submitted)

[img] PDF (24 Pages)
Productivity_Improvement_By_Using_Line_Balancing_Technique_Case_Study_At_An_Electronic_Company_Zhafran_Aizat_Zakaria_TS178.5.Z42_2007_2.pdf - Submitted Version

Download (4MB)
[img] PDF (Full Text)
Productivity_Improvement_By_Using_Line_Balancing_Technique_Case_Study_At_An_Electronic_Company_Zhafran_Aizat_Zakaria_TS178.5.Z42_2007.pdf - Submitted Version
Restricted to Registered users only

Download (36MB)

Abstract

The problem of balancing assembly line is a classical industrial engineering problem. Even though much of the work area goes back to mid 50s and early 60s, the basic structure of the problem is relevant to the design production system today. The thesis is cover all the topic of assembly line balancing~ methodology and theory and the company approaches to implement this technique. The case study focused on Flextronics Malacca and parallel line in production lot and the model sequenced that both line more than one model. This is know and compare the two model to proven that the line more than one or parallel could be balanced or not. The scope of project characterized by following up the Flextronics approaches and their schedule planning to implement this technique which starting from October 2006 untill January 2007. For chapter 4 the result is used to compare before and after improvement to prove the effectiveness of the parallel line. After that chapter discussion is about the effectiveness of improvement by using this technique shall discuss by comparing the result. Finally the finding that will get from the study case to compare the Flextronics approaches and theory assembly line balancing before whether its relevant and practical or not to solve industrial production problem.

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Manufacturing industries, Assembly-line methods, Line of balance (Management)
Subjects: T Technology > T Technology (General)
T Technology > TS Manufactures
Divisions: Library > Final Year Project > FKP
Depositing User: Siddiq Jais
Date Deposited: 10 Jun 2013 08:52
Last Modified: 28 May 2015 03:54
URI: http://digitalcollection.utem.edu.my/id/eprint/8167

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year