Mohamad Fadzli, Mat Jusoh (2006) Simulation Study On The Performance Of Flow Shop Scheduling. Project Report. UTeM, Melaka, Malaysia. (Submitted)
PDF (24 Pages)
Simulation_Study_On_The_Performance_Of_Flow_Shop_Scheduling.pdf - Submitted Version Download (326kB) |
|
PDF (Full Text)
Simulation_Study_On_The_Performance_Of_Flow_Shop_Scheduling.pdf - Submitted Version Restricted to Registered users only Download (1MB) |
Abstract
An objective for this project to make some improvement in their performance and studied about the process flow between gating process and ranking process it is important to select which proposed alternative suitable for company to increase their productivity and profit. Therefore, in order to complete this project, I must know about the processing time and machining operations needed for the operator while doing their task. For simulated the project, I had used the Witness software because is a powerful and easy to use simulation tool for modeling all types of manufacturing systems. The planning of the project has been described in this report. There have eight chapters; introduction, literature review, methodology, data collection/data input, simulation model development, alternatives, result and discussion, and the last is conclusion and suggestion.
Item Type: | Final Year Project (Project Report) |
---|---|
Uncontrolled Keywords: | Manufacturing processes, Production management |
Subjects: | T Technology > T Technology (General) T Technology > TS Manufactures |
Divisions: | Library > Final Year Project > FKP |
Depositing User: | Jefridzain Jaafar |
Date Deposited: | 07 Jun 2013 02:04 |
Last Modified: | 28 May 2015 03:51 |
URI: | http://digitalcollection.utem.edu.my/id/eprint/7786 |
Actions (login required)
View Item |