Ng, Yuet Wan (2008) A Study Of Basin Frame Production : A Project Management Approach. Project Report. UTeM, Melaka, Malaysia. (Submitted)
![]() |
PDF (24 Pages)
A_Study_On_Basin_Frame_Production_A_Project_Management_Approach017_-_24_pages.pdf - Submitted Version Download (1MB) |
![]() |
PDF (Full Text)
A_Study_On_Basin_Frame_Production_A_Project_Management_Approach017_-_full_taxt.pdf - Submitted Version Restricted to Registered users only Download (10MB) |
Abstract
This report is part of PSM.This project is about basin frame of portable toilet produced by uleetech engineering sdn bhd.analysis is done in two area that are the process flow and the scheduling of the project to identify the weaknesses of current plan.the,n weaknesses are improved, process flow is analyzed and process is scheduled to effective time horizon.The schedule is realic with consideration of the capacity currently available in the schedule after applying project management technique.It is measured by using the percentage reducation in totalproject duration.The steps are demonstrated in & discussion chapter and improvement achieved is measured in terms of percentage reducation in total distance travelled.
Item Type: | Final Year Project (Project Report) |
---|---|
Uncontrolled Keywords: | Strategic planning , Project management , Production scheduling |
Subjects: | T Technology > T Technology (General) T Technology > TS Manufactures |
Divisions: | Library > Final Year Project > FKP |
Depositing User: | Mr. Thaqif Mohd Isa |
Date Deposited: | 12 May 2015 04:22 |
Last Modified: | 28 May 2015 04:22 |
URI: | http://digitalcollection.utem.edu.my/id/eprint/12054 |
Actions (login required)
![]() |
View Item |