Browse By Repository:

 
 
 
   

The Implementation Of Risk Management In Metal Industry : Case Study 2 (FMEA)

Noorfizlen , Mohd Nasir (2010) The Implementation Of Risk Management In Metal Industry : Case Study 2 (FMEA). Project Report. UTeM, Melaka, Malaysia. (Submitted)

[img] PDF (24 pages)
The_Implementation_Of_Risk_Management_In_Metal_Industry_-_Case_Study_2_(FMEA)_-_24_Pages.pdf - Submitted Version

Download (5MB)
[img] PDF (Full Text)
The_Implementation_Of_Risk_Management_In_Metal_Industry_-_Case_Study_2_(FMEA)_-_Full_Text.pdf - Submitted Version
Restricted to Registered users only

Download (5MB)

Abstract

The final year project (FYP) is one of the criteria in order to be considered as successfully completing the bachelor programmed. The final year project (FYP) also refers to the research orientation project. It practices the student to solve the current problem in industry based on the right research methodology. Basically, this project report divided by two parts which is FYP 1 and FYP 2. For the first semester, the report covered up the abstract, introduction, objective, research scope, literature review and the research methodology. But, for the second semester, the reports continue for the result, discussion and the conclusion. This project was carried out at Jati Beringin Sdn. Bhd, especially at the production area that focusing on the process of Thimble product that facing quality problems. The objectives of this project are to study, implement risk management and measure the effectiveness of the implementation. This study adopting the (AS/NZ 4360,2004): Risk Management Standard as a reference to managing operational risk of the company. Basically, FMEA (Failure Mode and Effect Analysis) is used as a tool to perform the implementation. As a result, an analysis of the risk will identify the failure that affect to the process that influence quality of the product. The effectiveness of the implementation is measured by determining which process is improved and significantly changed due to the implementation.

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Risk management, Risk assessment, Industrial safety -- Management
Subjects: T Technology > T Technology (General)
Divisions: Library > Final Year Project > FKP
Depositing User: Mi Azian Ab. Karim
Date Deposited: 15 May 2012 12:53
Last Modified: 28 May 2015 02:32
URI: http://digitalcollection.utem.edu.my/id/eprint/2966

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year