Browse By Repository:

 
 
 
   

Lean manufacturing implementation for the reduction of production times and quality issues in industry

Mahyuddin, Nurhanisah (2021) Lean manufacturing implementation for the reduction of production times and quality issues in industry. Project Report. Universiti Teknikal Malaysia Melaka, Melaka, Malaysia. (Submitted)

[img] Text (24 Pages)
Lean manufacturing implementation for the reduction of production times and quality issues in industry.pdf - Submitted Version

Download (429kB)
[img] Text (Full Text)
Lean manufacturing implementation for the reduction of production times and quality issues in industry.pdf - Submitted Version
Restricted to Repository staff only

Download (4MB)

Abstract

This study has been carried out at a chicken production process factory to identify the source of problem that caused production delays and quality issues in the industry. This study has conducted a direct time study to identify the time spent for each process and a Current Stream Map (CSM) was developed to show the flows of the process in current production plant. The non-value-added activities have been identified using Ishikawa diagram and Failure Modes and Effects Analysis (FMEA) in each element of the process and five types of waste has been found which are waiting, motion, transportation, defects, and inventory waste. As there are no proper equipment for slaughtering process and handling machine wrongly in chicken production process factory increased the production time and led to quality issues. An improvement plan which consists of Automatic Poultry Hanger, 5S pillars, new facility layout and Standard Operating Procedure (SOP) has been proposed to the industry to reduce the waste, improve the current production method, and remove the unnecessary elements. A Future State Map (FSM) of the revised time utilization of the process were developed which shows an improvement of time utilization by 21%.

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Waste, Utilization, Chicken, Improvement, Factory, Poultry, Quality, Industry, Map, Defects
Divisions: Library > Final Year Project > FKP
Depositing User: Norfaradilla Idayu Ab. Ghafar
Date Deposited: 23 Nov 2022 08:43
Last Modified: 23 Nov 2022 08:43
URI: http://digitalcollection.utem.edu.my/id/eprint/27127

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year