Browse By Repository:

 
 
 
   

Prototype Development Of Self Asses Split Unit Air Conditioning System Maintenance

Zainal, Muhammad Azim (2016) Prototype Development Of Self Asses Split Unit Air Conditioning System Maintenance. Project Report. UTeM, Melaka, Malaysia. (Submitted)

[img] Text (24 Pages)
Prototype Development Of Self Asses Split Unit Air Conditioning System Maintenance.pdf - Submitted Version

Download (658kB)

Abstract

This project will be performed to develop a device that can inform consumer when suitable time to do maintenance for their split unit system. To determine the most suitable time for maintenance on air conditioner is not an easy decision for normal consumer. This project was performed to design and fabricate a device that can help consumer on that problem. Maintenance should be done when the performance of the system dropped below satisfied level. Performance of split air conditioner system was determined by Coefficient of Performance (COP). The project had been conducted by interrupting airflow on condenser and evaporator to simulate low performance of the system. The study had determined the best coefficient of performance of the selected unit was 5.19 while the lowest coefficient of performance was 1.98. From the study also determined the best time to do maintenance on the split unit when the coefficient of performance between 2 to 4.

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Air conditioning - Maintenance and repair, Air conditioning - Technological innovations
Subjects: T Technology > T Technology (General)
T Technology > TH Building construction
Divisions: Library > Final Year Project > FTK
Depositing User: Mohd Hannif Jamaludin
Date Deposited: 15 Dec 2017 04:20
Last Modified: 15 Dec 2017 04:20
URI: http://digitalcollection.utem.edu.my/id/eprint/20196

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year