Browse By Repository:

 
 
 
   

Time Study Method Implementation At Jecmetal Industries Sdn. Bhd

Amira, Sahari (2012) Time Study Method Implementation At Jecmetal Industries Sdn. Bhd. Project Report. UTeM, Melaka, Malaysia. (Submitted)

[img] PDF (24 pages)
Time_Study_Method_Implementation_At_Jecmetal_Industries_Sdn._Bhd._24_pages.pdf - Submitted Version

Download (275kB)
[img] PDF (Full Text)
Time_Study_Method_Implementation_At_Jecmetal_Industries_Sdn._Bhd._Full_Text.pdf - Submitted Version
Restricted to Registered users only

Download (11MB)

Abstract

This project describes on the main issue in the Jecmatal Industries Sdn. Bhd. The major issue need to be overcome is to rearrange or handle the cycle time in producing a product focus on production department. The method that were used was observation, training and informal interviews on gaining the information from the company. The project propose one technique which are apply time study method. The objective of this project are to identify and understand the process operation for clearly documenting a particular job of the process. Besides, this project also suggest time study analysis and implement the system of procedures of time study method in order to handle and reduce cycle time of product. The data handling with using a software. The Microsoft Excel 2010 has chosen as the software because it is friendly software, and also cheap and affordable. From the result shows that decreasing number of total standard time of selected product. Based on the review by using time study method, the company can get good result in order to increase the productivity. For the future work, the time study method can be improved by implemented the techniques more details in order to determine the suitable performance rating and allowances. Besides that, time study method can be improved time to time and the time study technician should look for detail information from sources on how to apply the formula to finding the total standard time. ABSTRACT

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Quality control -- Statistical methods, Process control -- Statistical methods
Subjects: T Technology > T Technology (General)
T Technology > TS Manufactures
Divisions: Library > Final Year Project > FKP
Depositing User: Mr. Zulfadhli Razaly
Date Deposited: 23 Jan 2014 04:53
Last Modified: 28 May 2015 04:07
URI: http://digitalcollection.utem.edu.my/id/eprint/9886

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year