Muhamad Hafizuddin, Mohd Ridowan (2010) The Design Of A Pre-Assembly Of Blood Collection Tube Mechanism. Project Report. UTeM, Melaka, Malaysia. (Submitted)
PDF (24 pages)
The_Design_Of_A_Pre-Assembly_Of_Blood_Collection_Tube_Mechanism_24_pages.pdf - Submitted Version Download (391kB) |
|
PDF (Full Text)
The_Design_Of_A_Pre-Assembly_Of_Blood_Collection_Tube_Mechanism_full_text.pdf - Submitted Version Restricted to Registered users only Download (4MB) |
Abstract
The design of a pre-assembly of blood tube mechanism is a study done on a very simple thing that most of us take it for granted. It is a simple process which is to assemble three pieces of the blood collection tube mechanism which consists of the tube, top cap and the rubber valve. All these parts need to be positioned in such a position so that it could be assembled. The study starts with the studies of the concept needed to get the process done and for that, the vibratory bowl feeder system were chosen. Based from the existing design of the vibratory bowl feeder, the customized bowl feeder that could align the top cap was designed. The traps and all the logic involved to ensure that the device works were taken into consideration thus creating a system that were possibly fool-proof enough for the assembly process to take place. Extra systems were added into the existing vibratory bowl feeder system such as the camera, riser, alignment and the punching mechanism. All these system were combined under the logic to pre-assemble the blood collection tube mechanism before it goes into the vacuum chamber for vacuum process so that the blood collection tube is usable for blood collection process. The design were later discussed on the design specification and the reliability of the design and the future or the improvement that could be done if this project could be taken further by any inspired students for further studies.
Item Type: | Final Year Project (Project Report) |
---|---|
Uncontrolled Keywords: | Engineering design, Medical instruments and apparatus -- Design and construction, Blood |
Subjects: | T Technology > T Technology (General) T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Library > Final Year Project > FKM |
Depositing User: | Mr. Zulfadhli Razaly |
Date Deposited: | 23 Jan 2014 04:54 |
Last Modified: | 28 May 2015 04:06 |
URI: | http://digitalcollection.utem.edu.my/id/eprint/9803 |
Actions (login required)
View Item |