Browse By Repository:

 
 
 
   

Simulation Modeling And Optimization In Manufacturing Case Study Shop Floor

Irwan , Mohamad Halim (2006) Simulation Modeling And Optimization In Manufacturing Case Study Shop Floor. Project Report. Melaka, Malaysia, UTeM. (Submitted)

[img] PDF (24 Pages)
Simulation_Modeling_And_Optimization_In_Manufacturing_Case_Study_Shop_Floor_-_Irwan_b_Mohamad_Halim_-_TS176.I78_2006_24_Pages.pdf - Submitted Version

Download (1MB)
[img] PDF (Full Text)
Simulation_Modeling_And_Optimization_In_Manufacturing_Case_Study_Shop_Floor_-_Irwan_b_Mohamad_Halim_-_TS176.I78_2006.pdf - Submitted Version
Restricted to Registered users only

Download (15MB)

Abstract

This PSM Project report is about the simulation model that applied in the manufacturing system. This simulation model will showed the process that included in the factory. From here also, we can see, the process of producing a product from beginning until finishing. Firstly, before starting this project, an objectives and scope of project should be defmed before. This is a guideline for me to complete this projecL Then, the literature review or studying this title is done by referring to the journal, books, and articles. This process is important because to generate some ideas until know completely about the simulation model. Beside that, this is purpose to study about the definition of shop floor in factory and to know about the application of shop floor. Some of the generate ideas and practices have been described in this report. The limitation and problem occurred also have been stated in this reports. The topics will be discussed in this report includt:d manufacturing issues that ",~II be addressed using simulation, simulation software that will be using in manufacturing applications, technique to developed a simulation model and result from the simulation model. Comparison for each alternative and propose layout also will be discussed. For this PSM project, the project is more focused on Witness simulation software. This software acted as tool to create a simulation modeling in manufacturing system. nus simulation software have been selected because it is easy and capable to simulate the activities, and also capable to simulate the arrival entities for each station of process. The process also can be set up for one shift duty that is 8 hours for working hours. Time that used in this process is in seconds. Process plalllling and the methodology in completing this process also have been described in this report completely. Keywords: productivity, cycle time, Work In Progress (W.I.P). tolerance. modeling.

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Production engineering, Design,Industrial, Simulation methods
Subjects: T Technology > T Technology (General)
T Technology > TS Manufactures
Divisions: Library > Final Year Project > FKP
Depositing User: Nooraidillah Rasdi
Date Deposited: 23 Jul 2013 06:59
Last Modified: 28 May 2015 03:59
URI: http://digitalcollection.utem.edu.my/id/eprint/8824

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year