Muhammad Firdaus , Md Yusof (2008) SCADA-Supervisory Control and Data Acquisition Based On Electrical Load Controller. Project Report. UTeM, Melaka, Malaysia. (Submitted)
![]() |
PDF (24 Pages)
SCADA-Supervisory_Control_and_Data_Acquisition_Based_On_Electrical_Load_Controller_-_Muhammad_Firdaus_b_Md_Yusof_-_T58.6.M44_2008_24_Pages.pdf - Submitted Version Download (449kB) |
![]() |
PDF (Full Text)
SCADA-Supervisory_Control_and_Data_Acquisition_Based_On_Electrical_Load_Controller_-_Muhammad_Firdaus_b_Md_Yusof_-_T58.6.M44_2008.pdf - Submitted Version Restricted to Registered users only Download (5MB) |
Abstract
The project is used to monitor, control and supervise electrical loads or equipment. SCADA stands for Supervisory Control and Data Acquisition. As the name indicates, it is not a full control system, but rather focuses on the supervisory level. As such, it is a purely software package that is positioned on top of a hardware to which it is interfaced via RTU’s (Remote Terminal Units). Indusoft Web Studio is used as software for this project. The SCADA system supports the power system operator in controlling the remote or local terminal equipments such as opening or closing relays or circuit breaker with security features. Data are obtained from RTU’s installed in the automated electrical distribution panel and delivered at the system control centre by local I/O devices.
Item Type: | Final Year Project (Project Report) |
---|---|
Uncontrolled Keywords: | Electric power systems, Supervisory control systems -- Programmed instruction, Automatic data collection systems -- Programmed instruction |
Subjects: | T Technology > T Technology (General) |
Divisions: | Library > Final Year Project > FKE |
Depositing User: | Nooraidillah Rasdi |
Date Deposited: | 12 Apr 2012 10:01 |
Last Modified: | 28 May 2015 02:20 |
URI: | http://digitalcollection.utem.edu.my/id/eprint/855 |
Actions (login required)
![]() |
View Item |