Browse By Repository:

 
 
 
   

Development Of Standard Time Utilizing Work Method And Time Measurement In QC Department At A Textiles Manufacturing Company

Nor Izati , Md Salleh (2007) Development Of Standard Time Utilizing Work Method And Time Measurement In QC Department At A Textiles Manufacturing Company. Project Report. UTeM, Melaka, Malaysia. (Submitted)

[img] PDF (24 Pages)
Development_Of_Standard_Time_Utilizing_Work_Method_And_Time_Measurement_In.._-_24_pages.pdf - Submitted Version

Download (371kB)
[img] PDF (Full Text)
Development_Of_Standard_Time_Utilizing_Work_Method_And_Time_Measurement_In...pdf - Submitted Version
Restricted to Registered users only

Download (974kB)

Abstract

There are many alternatives available for improving productivity. Work motion and time study is one way to achieve it. In this research, time study which is work measurement is done in order to standardize the working time especially for QC (quality control) jobs in Textiles Manufacturing Company. In addition, the work motions also have been given an attention. The motion study at QC is done to improve job methods. This research of the work motion and time study has its objective to eliminate unnecessary QC work, to design improved methods and procedures which are most effective, require least effort and are suited to the person who uses them. Moreover, it provides methods of measuring work determining performance or productivity for QC department.

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Quality control -- Statistical methods, Quality control, Production management -- Quality control
Subjects: T Technology > T Technology (General)
T Technology > TS Manufactures
Divisions: Library > Final Year Project > FKP
Depositing User: Nor Ridzuan S.Kasehan
Date Deposited: 13 Jun 2013 07:27
Last Modified: 28 May 2015 03:51
URI: http://digitalcollection.utem.edu.my/id/eprint/7778

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year