Study The Process Of Total Preventive Maintenance (TPM) Of Injection Moulding Machine Arbug 420C

Hidayatullah , Musa (2008) Study The Process Of Total Preventive Maintenance (TPM) Of Injection Moulding Machine Arbug 420C. Project Report. UTeM, Melaka,Malaysia. (Submitted)

[img] PDF (24 Pages)
Study_The_Process_Of_Total_Preventive_Maintenance_(_TPM_)_Of_Injection_Moulding_Machine_Arburg_420c_Hidayatullah_Bin_Musa_-_24_Pages.pdf - Submitted Version

Download (143kB)
[img] PDF (Full Text)
Study_The_Process_Of_Total_Preventive_Maintenance_(_TPM_)_Of_Injection_Moulding_Machine_Arburg_420c_Hidayatullah_Bin_Musa.pdf - Submitted Version
Restricted to Registered users only

Download (831kB)

Abstract

This project describes about the application of Total Preventive Maintenance (TPM) on the Injection Molding Machine. As a preference, this project has be held in the Casting Laboratory in Universiti Teknikal Malaysia Melaka (UTeM) located in Fasa B. The type of machine used in this research is the Arburg 420C Injection Molding Machine. The purpose of this research is to obtain the best way to perform the maintenance method for the Arburg 420C Injection Molding Machine using the TPM method. By combining two tools of total preventive maintenance which was based on time and based on machine, the project has been achieved by doing internal maintenance and external maintenance of that machine. The maintenance of the machine has been done according to daily, weekly, monthly and yearly. Research has been done before and after the machine was used. At the end of this project, the maintenance application was used which the TPM has been documented and recorded based on standard as reference later. Thus, the TPM keep the Injection Molding Machine more cleanly, clearly, equipments and facilities will be systematic arrangement efficient and effective. Therefore, TPM makes the machine always in good condition and preventing the machine becomes breakdowns.

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Plant maintenance, Plant maintenance -- Management, Total productive maintenance, Plant maintenance -- Planning
Subjects: T Technology > T Technology (General)
T Technology > TS Manufactures
Divisions: Library > Final Year Project > FKP
Depositing User: Mohd Syahrizal Mohd Razali
Date Deposited: 16 Oct 2012 01:21
Last Modified: 28 May 2015 03:42
URI: http://digitalcollection.utem.edu.my/id/eprint/6344

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year