Browse By Repository:

 
 
 
   

A Study On Decision Scenario Of Turnaround Days Of Preventive Maintenance

Izzati, Izman (2011) A Study On Decision Scenario Of Turnaround Days Of Preventive Maintenance. Project Report. UTeM, Melaka, Malaysia. (Submitted)

[img] PDF (24 Pages)
A_Study_On_Decision_Scenario_Of_Tornaround_Days_Of_Preventive_Maintenance-24_Pages.pdf - Submitted Version

Download (143kB)
[img] PDF (Full Text)
A_Study_On_Decision_Scenario_Of_Tornaround_Days_Of_Preventive_Maintenance-Full_Text.pdf - Submitted Version
Restricted to Registered users only

Download (603kB)

Abstract

Preventive maintenance is a schedule of planned maintenance actions aimed at the prevention of breakdowns and failures. The primary goal of preventive maintenance is to prevent the failure of equipment before it actually occurs. The use of preventive maintenance strategies in the workplace is meant to achieve three things: a lower cost of replacement, a minimum number of breakdown and maintenance time. This case study is related to the machine maintenance which affects the production. A plant maintenance should be used to schedule the sequence of any machine that has achieve period of rehabilitation. A well maintenance schedule needed on sufficient spare parts as well as controlling the associated costs and at the same time the total cost of benefit are also high. Statistical analysis method is applied to solve the problem in this case study. This analysis is attempts to determine the best machine maintenance turnaround days. Through statistical analysis, some scenario of machine maintenance turnaround days will be scrutinized. Based on the result, the best turnaround days for machine maintenance that can produce the highest expected total cost (benefit/loss) for one machine in one day will be proposed. The main purpose of this case study is to determine the best machine maintenance turnaround days that provide the less cost and highest benefit by using the statistical approach.

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Surface roughness, Electric metal-cutting, Milling machinery, Electrodes
Subjects: T Technology > T Technology (General)
T Technology > TS Manufactures
Divisions: Library > Final Year Project > FKP
Depositing User: Nik Syukran Muiz Rashid
Date Deposited: 20 Sep 2012 01:02
Last Modified: 28 May 2015 03:38
URI: http://digitalcollection.utem.edu.my/id/eprint/5905

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year