Syed Eddy Afifi, Syed Abdullah (2010) Comparative Study Of Ideal Engine Test Cell System At Proton As Compared To FKM, UTeM. Project Report. UTeM, Melaka, Malaysia. (Submitted)
![]() |
PDF (24 Pages)
Comparative_Study_Of_Ideal_Engine_Test_Cell_System_At_Proton_As_Compared_To_FKM,_UTeM_-_Syed_Eddy_Afifi_b_Syed_Abdullah_-_TJ759.S42_2010_24_Pages.pdf - Submitted Version Download (385kB) |
![]() |
PDF (Full Text)
Comparative_Study_Of_Ideal_Engine_Test_Cell_System_At_Proton_As_Compared_To_FKM,_UTeM_-_Syed_Eddy_Afifi_b_Syed_Abdullah_-_TJ759.S42_2010.pdf - Submitted Version Restricted to Registered users only Download (20MB) |
Abstract
Engine test cell is one of the main tools in engine testing within automotive industry. FKM, UTeM also has an engine test cell facility for their student’s uses. This current engine test cell faced so many problems and need to be analyzed. This project objective is to analyze and evaluate the performance of this engine test cell and make a comparative analysis with an industrial standard engine test cell at PROTON Shah Alam facilities. An ideal working principle of an engine test cell is investigated and studied. Various systems will be discussed including data collection system, ventilation and air conditioning system, engine cooling system, fire alarm and safety precaution system, electrical system, fuel system and engine exhaust system. An engine testing capabilities is listed down to differentiate types of testing that both test cells are capable of. The engine testing requirement for both test cell is studied based on the parameters monitored, operational procedure, data logging, engine cooling and safety precaution. From the analysis and observation of a typical engine test procedure performed at PROTON facilities, the operating procedure was analyzed. As a result, the main components of an industrial standard engine test cell were identified. The function and operating procedure of these components were listed and compared with the existing engine test cell configuration in FKM. Later on, improvement modification was identified and compiled as a list of recommendation to further improve the existing engine test cell system and operating procedure in FKM, UTeM engine test cell system.
Item Type: | Final Year Project (Project Report) |
---|---|
Uncontrolled Keywords: | Internal combustion engines -- Testing |
Subjects: | T Technology > T Technology (General) T Technology > TJ Mechanical engineering and machinery |
Divisions: | Library > Final Year Project > FKM |
Depositing User: | Nooraidillah Rasdi |
Date Deposited: | 25 May 2012 06:55 |
Last Modified: | 28 May 2015 02:34 |
URI: | http://digitalcollection.utem.edu.my/id/eprint/3326 |
Actions (login required)
![]() |
View Item |