Ramlee, Naim A'imullah (2019) Establishment Of Value Stream Mapping (VSM) Of Balloon Production. Project Report. Universiti Teknikal Malaysia Melaka, Melaka, Malaysia. (Submitted)
![]() |
Text (24 Pages)
Establishment Of Value Stream Mapping (VSM) Of Balloon Production.pdf - Submitted Version Download (292kB) |
![]() |
Text (Full text)
Establishment Of Value Stream Mapping (VSM) Of Balloon Production.pdf - Submitted Version Restricted to Registered users only Download (5MB) |
Abstract
In the manufacturing industry, lean manufacturing is becoming increasingly popular are use to obtain results more efficiently and profitably. Evert the Balloon Company is an industry that produced various of balloon established in Ayer Keroh, Melaka. It has been found the company weak in implementing lean manufacturing and do not have a standard operating procedure (SOP) and uncontrollable Cycle Time (CT) in their production line. The purpose of this study is to improve the manufacturing productivity by using Value Stream Mapping technique
Item Type: | Final Year Project (Project Report) |
---|---|
Uncontrolled Keywords: | Manufacturing Processes, Lean Manufacturing, Production Management, Value Analysis (Cost Control) |
Subjects: | T Technology > T Technology (General) T Technology > TS Manufactures |
Divisions: | Library > Final Year Project > FKP |
Depositing User: | Norfaradilla Idayu Ab. Ghafar |
Date Deposited: | 18 Mar 2021 01:41 |
Last Modified: | 19 Dec 2023 06:58 |
URI: | http://digitalcollection.utem.edu.my/id/eprint/25049 |
Actions (login required)
![]() |
View Item |