Browse By Repository:

 
 
 
   

Time study and work measurement implementation in manufacturing industry

Azizan, Aniza Nazirah (2018) Time study and work measurement implementation in manufacturing industry. Project Report. Universiti Teknikal Malaysia Melaka, Melaka, Malaysia. (Submitted)

[img] Text (24 Pages)
Time Study And Work Measurement Implementation In Manufacturing Industry.pdf - Submitted Version

Download (412kB)
[img] Text (Full Text)
Time study and work measurement implementation in manufacturing industry.pdf - Submitted Version
Restricted to Repository staff only

Download (3MB)

Abstract

‘Time Study and Work Measurement implementation in Manufacturing Industry’ is a project tittle that has been carried out at Everts (Malaysia) Sdn. Bhd in Ayer Keroh Melaka. There are many ways for improving the productivity and time study is one way to achieve it. In this case, there are 7 job elements that has been carried out. The objective of this study is to conduct time study and work measurement analysis in a manufacturing industry using stopwatch and also to analyze the motion in workplace using Therblig (Simo-Chart). In the objective of this project also to suggest a solution to improve the process flow by reducing the unproductive work among the employees. The problem comes when the company want to find a standard time especially for manual task in production planning. The aim of this study also is to find the suitable rating performance and 5% allowances for each process are given in order to conduct the stopwatch time study. There are two method using in this study which use method to conduct time study and method to analyse motion in workplace. Motion of the employees has been studied by using Therblig (Simo-chart) to give a quick visual analysis for identifying inefficiencies in the process, and repeated design behaviour exhibited by the employees. Moreover, 4 out of 7 job element have been improve that can establish the standard time of the process which involve to increase productivity of the company. By making some improvement, the reduction time study can be reduce or eliminate and the motions of the two hands using therblig analysis involved in doing an operation, inefficient motion pattern can be identified. This project was developed by using the time study which will be used as a single source of references by the company to increase the productivity of Industry Manufacturing.

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Time study, Motion study, Industrial productivity
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Library > Final Year Project > FKP
Depositing User: Mohd Hannif Jamaludin
Date Deposited: 23 Sep 2019 06:44
Last Modified: 18 Dec 2023 06:09
URI: http://digitalcollection.utem.edu.my/id/eprint/23474

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year