Zainal, Muhammad Azim (2016) Prototype Development Of Self Asses Split Unit Air Conditioning System Maintenance. Project Report. UTeM, Melaka, Malaysia. (Submitted)
Text (24 Pages)
Prototype Development Of Self Asses Split Unit Air Conditioning System Maintenance.pdf - Submitted Version Download (658kB) |
Abstract
This project will be performed to develop a device that can inform consumer when suitable time to do maintenance for their split unit system. To determine the most suitable time for maintenance on air conditioner is not an easy decision for normal consumer. This project was performed to design and fabricate a device that can help consumer on that problem. Maintenance should be done when the performance of the system dropped below satisfied level. Performance of split air conditioner system was determined by Coefficient of Performance (COP). The project had been conducted by interrupting airflow on condenser and evaporator to simulate low performance of the system. The study had determined the best coefficient of performance of the selected unit was 5.19 while the lowest coefficient of performance was 1.98. From the study also determined the best time to do maintenance on the split unit when the coefficient of performance between 2 to 4.
Item Type: | Final Year Project (Project Report) |
---|---|
Uncontrolled Keywords: | Air conditioning - Maintenance and repair, Air conditioning - Technological innovations |
Subjects: | T Technology > T Technology (General) T Technology > TH Building construction |
Divisions: | Library > Final Year Project > FTK |
Depositing User: | Mohd Hannif Jamaludin |
Date Deposited: | 15 Dec 2017 04:20 |
Last Modified: | 15 Dec 2017 04:20 |
URI: | http://digitalcollection.utem.edu.my/id/eprint/20196 |
Actions (login required)
View Item |