Browse By Repository:

 
 
 
   

Development of overall performance effectiveness (OPE) at the semiconductor industry : A case study

Muhammad Nor, Nor Nazihah (2016) Development of overall performance effectiveness (OPE) at the semiconductor industry : A case study. Project Report. Universiti Teknikal Malaysia Melaka, Melaka, Malaysia. (Submitted)

[img] Text (24 Pages)
Development Of Overall Performance Effectiveness (OPE) At The Semiconductor Industry A Case Study 24 Pages.pdf - Submitted Version

Download (565kB)
[img] Text (Full Text)
Development of overall performance effectiveness (OPE) at the semiconductor industry a case study.pdf - Submitted Version
Restricted to Registered users only

Download (1MB)

Abstract

Overall Performance Effectiveness (OPE) is used to identify and determine the performance of the operators during do their work or job tasks. By determine the value of OPE, the performance of the operators can be analyze and then some corrective action or recommendations can be suggested. In this project, the subject of study is the Honing process and it is focused on the Honing Machine 9 where the time study using direct stopwatch is conducted. The observation is done at the honing process to identify the process flow and also the losses at the section. The time study is conducted to collect the data that is related to the OPE. After time study is conducted, the standard time of the honing process is calculated and also the standardization work combination table can be developed. The OPE can be computed by obtaining the availability, performance and also the quality ratio of the honing process operators. The availability is the time operators working productively over the time scheduled. For the performance ratio, the value can be gained from the number of actual output of the operators over the expected output or their labor standard. Lastly, the quality is the number of good parts over the total parts produced by the operators. The result shows the highest OPE is during Week 3 which is 74.96% and the lowest OPE is on Week 2 which is 70.84%. At the end of the project, the three factors of the OPE are analyzed. Further study of the project the OPE is suggested to be continue at the Honing Machine 9 and also implemented the OPE to all the honing machines at the company.

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Total productive maintenance, Semiconductor industry, Industrial equipment -- Maintenance and repair -- Management
Subjects: T Technology > T Technology (General)
T Technology > TS Manufactures
Divisions: Library > Final Year Project > FKP
Depositing User: Nor Aini Md. Jali
Date Deposited: 08 Nov 2017 03:26
Last Modified: 05 Dec 2023 02:18
URI: http://digitalcollection.utem.edu.my/id/eprint/19801

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year