Siti Noridayu, Samad (2013) A Study Of Value Stream Mapping (VSM) In HPF Plant. Project Report. UTeM, Melaka, Malaysia. (Submitted)
![]() |
PDF (24 Pages)
A_Study_Of_Value_Stream_Mapping_(VSM)_In_HPF_Plant.pdf - Submitted Version Download (923kB) |
![]() |
PDF (Full Text)
A_Study_Of_Value_Stream_Mapping_(VSM)_In_HPF_Plant.pdf - Submitted Version Restricted to Registered users only Download (6MB) |
Abstract
Miyazu Malaysia Sdn Bhd (MMSB) is one of company that produces metal stamping product. Nowadays, in manufacturing industries field the competition are more intense. To increase productivity and have a good quality of product without producing any waste is impossible. The purpose of this study is to propose Value Stream Mapping (VSM) at manufacturing company to reduce waste at the HPF Plant production line. In order to draw VSM, Microsoft Visio is the best tool to be used. VSM will lead student to define the current state map then analyze the waste by create questions and the answer will help student to generate idea to seek opportunities for improvement, and finally develop the future state map to propose to the company for RF Assy Center Pillar Outer Rh product family. All the improvement is using Lean Manufacturing tool and technique. It can be concluded from the current state map of RF Assy Center Pillar Outer Rh the future state map suggest that 3.8% of lead time reduction could be achieved by eliminating most of the waste that has been identified.
Item Type: | Final Year Project (Project Report) |
---|---|
Uncontrolled Keywords: | Production engineering, Plant layout, Materials management, Material requirements planning |
Subjects: | T Technology > T Technology (General) T Technology > TS Manufactures |
Divisions: | Library > Final Year Project > FKP |
Depositing User: | Jefridzain Jaafar |
Date Deposited: | 25 Jun 2014 04:39 |
Last Modified: | 28 May 2015 04:26 |
URI: | http://digitalcollection.utem.edu.my/id/eprint/12602 |
Actions (login required)
![]() |
View Item |