Browse By Repository:

 
 
 
   

Development Of An Office Total Productive Maintenance System

Wan Hasrulnizzam , Wan Mahmood and Zuhriah, Ebrahim (2007) Development Of An Office Total Productive Maintenance System. Project Report. UTeM, Melaka, Malaysia. (Submitted)

[img] PDF (Full Text)
Development_Of_An_Office_Total_Productive_Maintenance_System.pdf - Submitted Version
Restricted to Registered users only

Download (9MB)

Abstract

This project is performed to develop an office TPM. The development of the Office TPM has been proved as a good approach while improving working system. Lecturers rooms at Faculty of Manufacturing Engineering, Universiti Teknikal Malaysia Melaka (UTeM) were selected for data gathering. Observation and interview were used in this project. The respondents of this project involved lecturers and students. For the development of an office TPM, a lecturer's room was selected. 5S was used as the main approach in the development of office TPM. The results from the development of office TPM were positively response to staff and students which directly use the lecturer's room. It will use as a benchmark lecturer's room for office TPM towards excellent working system.

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Total productive maintenance
Subjects: T Technology > T Technology (General)
T Technology > TS Manufactures
Divisions: Library > Long/ Short Term Research > FKP
Depositing User: Jefridzain Jaafar
Date Deposited: 19 Mar 2014 07:57
Last Modified: 28 May 2015 04:19
URI: http://digitalcollection.utem.edu.my/id/eprint/11668

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year