Lee, Hwang Chin (2006) Preventive Maintenance Management Decision Support System For Palm Oil Mill (PMMDS). Project Report. UTeM, Melaka, Malaysia. (Submitted)
![]() |
PDF (24 Pages)
Preventive_Maintenance_Management_Decision_Support_System_For_Palm_Oil_Mill_(PMMDS).pdf - Submitted Version Download (3MB) |
![]() |
PDF (Full Text)
Preventive_Maintenance_Management_Decision_Support_System_For_Palm_Oil_Mill_(PMMDS).pdf - Submitted Version Restricted to Registered users only Download (41MB) |
Abstract
All the chapters that will be discussed in this thesis will contain the overall proposed system - Preventive Maintenance Management Decision Support System. It is start from the Introduction, Literature Review and Project Methodology, Analysis, Design and Conclusion. In the chapter introduction, the scopes that will be discussed are briefly describing the project background. From the project background, the problem statements have been found and the proposed system will be suggested by discussing the objectives of developing proposed system. The scopes of the proposed system have stated as a guideline to make sure the proposed system develop within the scopes. After that, the project significant has been listed to let the reader understand about the business value of proposed system. In the chapter literature review and project methodology, fact and finding has been done for all the information that related with the proposed system. From the research has done the appropriate project methodology- V-Model; has been chosen to use to develop the proposed system. In the chapter analysis, the analysis skills are required here to analysis the process of the current system and the problems that the current system had faced. After that, the requirements analysis has been done to analys is the basic requirements that required developing the proposed system. In the chapter design, there contain the information of high-level design that discussed about the raw data input/ output, system architecture, user interface design and database design of the proposed system. At last, the conclusion has been done for the overall proposed system where the observation weakness and strengths, propositions for improvement and contribution of the proposed system are stated too.
Item Type: | Final Year Project (Project Report) |
---|---|
Uncontrolled Keywords: | Decision support systems -- Data processing, System design, Decision support systems, Maintenance -- Management -- Data processing |
Subjects: | T Technology > T Technology (General) |
Divisions: | Library > Final Year Project > FTMK |
Depositing User: | Jefridzain Jaafar |
Date Deposited: | 23 Jul 2013 07:02 |
Last Modified: | 28 May 2015 03:59 |
URI: | http://digitalcollection.utem.edu.my/id/eprint/8785 |
Actions (login required)
![]() |
View Item |