Driving And Hindering Factors In Developing Pico-Hydro Generation System In Malaysia

Ab Rahman, Nur Aqilah (2016) Driving And Hindering Factors In Developing Pico-Hydro Generation System In Malaysia. Project Report. UTeM, Melaka, Malaysia. (Submitted)

[img] Text (24 Pages)
Driving And Hindering Factors In Developing Pico-Hydro Generation System In Malaysia.pdf - Submitted Version

Download (2MB)

Abstract

In this era of globalization,people are now more concerned about the system of greem technology in reducing a major source capable of generating energy such as fuel,fossil and other energy sources that cannot be renewed in the next decade. In the same time, the implementation of energy renewable and has performed with many countries,including Thailand and other countries. In addition, the use of nonrenewable energy is quite expensive and can lead to contamination problems. The world is concerned about the cleanliness of the environment today and focuses more on the fuel sources depleting energy generating performances.This problems can be solved through a method of alternative systems has been conducted, the Pico-hydro system. Pico-hydro has known as source of renewable green energy by using a small river in the generation of electricity without depending on any sources that is renewable. The advantages and benefits derived from this energy capable of improving the definition of the population lives in rural areas even if the power generated is less than 5kW. In addition, the replacement of scarce resources has been completed with the construction of Pico-hydro built that is capable of generating energy in the low range of the base 5kW. Pico-hydro system can be seen through the water moving through tha water turns turbines that can cause the resulting drive capable of electricity. This system can generate electricity that can be used every day to improve the quality and standard of living of the population with better. In Malaysia itself,the use of Pico-hydro system is still in its infancy and many of the technologies used were brought in from outside the country. In addition, it can be advantageous to society in rural areas in developing Pico-hydro system. This system can be sustained because the electric system is capable of continously generated as long as the water source is not lost on this Eru1h.

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Hydroelectric power plants, Electric utilities - Malaysia
Subjects: T Technology > T Technology (General)
T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Library > Final Year Project > FTK
Depositing User: Mohd Hannif Jamaludin
Date Deposited: 08 Nov 2017 05:08
Last Modified: 08 Nov 2017 05:08
URI: http://digitalcollection.utem.edu.my/id/eprint/19922

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year