Browse By Repository:

 
 
 
   

The Implementation Of Risk Management At Aerospace Manufacturing Company : Case Study 1 (Safety)

Afifah, Mohd Fauzi (2010) The Implementation Of Risk Management At Aerospace Manufacturing Company : Case Study 1 (Safety). Project Report. UTeM, Melaka, Malaysia. (Submitted)

[img] PDF (24 pages)
The_Implementation_Of_Risk_Management_At_Aerospace_Manufacturing_Company_-__Case_Study_1_(Safety)_-_24_pages.pdf - Submitted Version

Download (522kB)
[img] PDF (Full Text)
The_Implementation_Of_Risk_Management_At_Aerospace_Manufacturing_Company_-__Case_Study_1_(Safety)_-_Full_Text.pdf - Submitted Version
Restricted to Registered users only

Download (2MB)

Abstract

This report presents the study of risk management implementation in terms of safety at ABC Sdn Bhd, one of the aerospace manufacturing companies in Malaysia. The company has implemented risk management in order to sustain their mission and vision from affected by any potential risks. Although that, the production areas are exposed with potential hazards in terms of safety that can affect workers, areas and the company itself. The objectives are to study about risk management, to assess risk and to see the effectiveness of risk management implementation in terms of safety at selected company. Methods used in this study which is determined during doing the literature review are training, brainstorming, semi-structured interview, checklist, risk score matrix and ALARP principle. The risk management is learned through the literature review and training. Process of assessing risk in terms of safety is done by adopting the AS/NZS 4360:2004 Risk Management Standards as reference. The safety risk assessment assesses the Autoclave and Cleanroom section and the results are evaluated by using risk score matrix. The effectiveness of risk implementation in terms of safety is seeing from the decreasing of risk level after risk treatment is done and the increasing percentage of awareness on safety at the workplaces.

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Risk management Risk assessment Industrial safety -- Management Aerospace engineering
Subjects: T Technology > T Technology (General)
Divisions: Library > Final Year Project > FKP
Depositing User: Ahmad Abu Bakar
Date Deposited: 21 Mar 2012 05:26
Last Modified: 28 May 2015 02:24
URI: http://digitalcollection.utem.edu.my/id/eprint/1691

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year