Browse By Repository:

 
 
 
   

The Implementation Of Risk Management At Aerospace Manufacturing Company : Case Study 2 (Process)

Mohd Aminudin , Abdullah (2010) The Implementation Of Risk Management At Aerospace Manufacturing Company : Case Study 2 (Process). Project Report. UTeM, Melaka, Malaysia. (Submitted)

[img] PDF (24 pages)
The_Implementation_Of_Risk_Management_At_Aerospace_Manufacturing_Company_-_Case_Study_2__(Process)_-_24_pages.pdf - Submitted Version

Download (474kB)
[img] PDF (Full Text)
The_Implementation_Of_Risk_Management_At_Aerospace_Manufacturing_Company_-_Case_Study_2__(Process)_-_Full_Text.pdf - Submitted Version
Restricted to Registered users only

Download (2MB)

Abstract

This study presents the “Implementation of Risk Management in Aerospace Manufacturing Company (Process)”. The process of risk management is carry out in XYZ Sdn. Bhd, Batu Berendam, Melaka. This company in the process of implementation risk management to avoid any potentials risk that will affect the company mission, vision, and daily operation. Since there are several sections in XYZ Sdn. Bhd’s production floor, the processes in Cleanroom and Autoclave was selected because both sections are exposed with risk. The objectives of this study are to study the risk management, to implement risk management, and to measure the effectiveness of the implementation at this company. This report focuses on the process of managing risk in Cleanroom and Autoclave section using FMEA tool by followed the standard rating value for risk assessment from XYZ Sdn. Bhd. Besides that, methods such as training, brainstorming, and survey been used during the implementation of Risk Management. After analyzed the risks, the treatment plan were proposed in order to reduce the risk that in high and medium level to the low level. From the treatment plan, those risks had been analyzed for the second time in order to make sure whether the treatment plan is effectiveness or not. Lastly all the risks that had been treating are in low level that mean those risks in acceptable level and need to be monitor in the future.

Item Type: Final Year Project (Project Report)
Uncontrolled Keywords: Risk management Risk assessment Industrial safety -- Management Aerospace engineering
Subjects: T Technology > T Technology (General)
Divisions: Library > Final Year Project > FKP
Depositing User: Ahmad Abu Bakar
Date Deposited: 21 Mar 2012 05:46
Last Modified: 28 May 2015 02:24
URI: http://digitalcollection.utem.edu.my/id/eprint/1640

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year