How, Whee Ching (2014) Tool for mapping manufacturing critical-path time in job shop environment. Project Report. UTeM. (Submitted)
![]() |
Text
Tools for mapping manufacturing critical-path time in Job Shop.pdf Download (460kB) |
Abstract
Many companies are adopting a new production paradigm of mass customization to meet their customers’ future demands and survive in an intensely competitive market. However, mass customization manufacturing requires a high degree of flexibility to deliver customers’ orders on time. Lean Manufacturing as exemplified by the Toyota Production System is appropriate when production is characterized by a low mix and high volume environment. As the degree of product customization increases, the application of lean principles to ensure smooth production flow while keeping inventory level low becomes a major challenge. This study presents Quick Response Manufacturing (QRM) as an alternative strategy for a high mix and low volume production environment. QRM is a company-wide strategy with the key aspect of reduction in lead time. The case company, where the study is conducted is a components manufacturing company with a job shop production system. The company, making highly engineered products with variable demands, is confronted with the main challenge of consistently long lead times leading to poor-on time delivery performance to their customers. To mitigate this problem, a tool for mapping the manufacturing critical-path time (MCT) will be developed according to the current situation of the case company. The output of this tool is a lead time and visual indicator for the manufacturing critical-path time of a selected major product family. An appropriate methods based on QRM principles and virtual cell concept will be proposed to improve the MCT for the selected product.
Item Type: | Final Year Project (Project Report) |
---|---|
Uncontrolled Keywords: | Automobiles, Critical path analysis, Lean manufacturing |
Subjects: | T Technology > TS Manufactures |
Divisions: | Library > Final Year Project > FKP |
Depositing User: | Salleh Mohd Nor |
Date Deposited: | 25 Jan 2016 02:39 |
Last Modified: | 15 Jan 2024 04:21 |
URI: | http://digitalcollection.utem.edu.my/id/eprint/15645 |
Actions (login required)
![]() |
View Item |