|
|||||||||||||||||
Items where Division is "Library > Long/ Short Term Research > FKP" and Year is 2010
Jump to: Final Year Project Number of items: 7. Final Year ProjectLokman, Abdullah and Mohd Hisham, Nordin and Shariman, Abdullah and Lee, Wai Kiong (2010) PC Based Control of XYZ Motion for Storage System. Project Report. UTeM, Melaka, Malaysia. (Submitted) Mohamed Khaled, Omar and Mohd. Razali, Muhamad and Abdul Hafiz, Abdul Rajak (2010) An Integrated Approach To Supplier Selection Problem. Project Report. UTeM, Melaka, Malaysia. (Submitted) Mohamed Khaled, Omar and Nor Akramin, Mohamad and Sharmeeni, Murugan (2010) A Simulation Approach to Evaluate Quality/Cost Management Decisions. Project Report. UTeM, Melaka, Malaysia. (Submitted) Puvanasvaran, A. Perumal and Mohd Razali, Muhamad and Hasoloan Haery, Ian Pieter and Mohd Kamil, Sued (2010) Sustaining Quality System By Adopting Lean Thinking. Project Report. UTeM, Melaka, Malaysia. (Submitted) Sivarao, Subramonian and Taufik, , and Khairol Anuar, Rakiman and Lokman , Abdullah and Mohd Shahir, Kassim and Mohd Amri, Sulaiman (2010) Engineering of Mechanical Control Kit for Unmanned Grass Cutter. Project Report. UTeM, Melaka, Malaysia. (Submitted) Taufik, . and Tahul Ariffin, Abdullah (2010) Design and Analysis of Production Tooling for Metal Matrix Composite by Investment Casting. Project Report. UTeM, Melaka, Malaysia. (Submitted) Wahyono, Sapto Widodo (2010) Design of New Punch Geometry to Reduce Force in Sheet Metal Process. Project Report. UTeM, Melaka, Malaysia. (Submitted) |
|||||||||||||||||