Razak, Muhammad Aiman (2024) Retrofitting project for improved chiller system performance in a hotel, Kuala Lumpur, Malaysia. Project Report. Universiti Teknikal Malaysia Melaka, Melaka, Malaysia. (Submitted)
Text (24 Pages)
Retrofitting project for improved chiller system performance in a hotel, Kuala Lumpur, Malaysia.pdf - Submitted Version Download (397kB) |
|
Text (Full text)
Retrofitting project for improved chiller system performance in a hotel, Kuala Lumpur, Malaysia.pdf - Submitted Version Restricted to Registered users only Download (1MB) |
Abstract
This thesis addresses the pressing issue of energy inefficiency in commercial buildings, with a specific focus on the hotel industry, by investigating the impact of aging chiller systems. In response to the heightened environmental awareness, this research aims to contribute to sustainable practices through a comprehensive retrofitting project at the Sheraton Imperial Hotel Kuala Lumpur. The objectives include analyzing current chiller system inefficiencies, measuring improvements post-retrofitting, and evaluating economic feasibility. The methodology involves a preliminary energy audit, chiller selection considerations, and financial assessments. The retrofitting initiative, involving the replacement of the aging 19XR chiller with a Carrier 23XRV water-cooled chiller and Variable Frequency Drive (VFD) technology, demonstrates a remarkable 54% improvement in chiller plant efficiency. Financial analyses indicate a profitable venture with an expected annual electricity bill decrease, a payback period of 4.064 years, and a substantial return on investment (ROI) of 25%. The success of this retrofitting project not only establishes the Sheraton Imperial Hotel as a leader in operational excellence and environmental responsibility but also provides valuable insights for similar initiatives in the hospitality sector. Continuous monitoring and future research efforts are recommended to ensure long-term performance improvements and to inspire the adoption of sustainable practices throughout the industry.
Item Type: | Final Year Project (Project Report) |
---|---|
Uncontrolled Keywords: | Retrofit, Energy efficiency, Chiller system enhancement, Sustainable energy, Variable frequency drive |
Subjects: | T Technology > TH Building construction |
Divisions: | Library > Final Year Project > FTKE |
Depositing User: | Sabariah Ismail |
Date Deposited: | 31 Jul 2024 04:55 |
Last Modified: | 31 Jul 2024 04:55 |
URI: | http://digitalcollection.utem.edu.my/id/eprint/32911 |
Actions (login required)
View Item |