Shamsudin, Muhamad Khalis Lamani (2022) Real time electrical load monitoring through phone. Project Report. Universiti Teknikal Malaysia Melaka, Melaka, Malaysia. (Submitted)
![]() |
Text (Full Text)
Real time electrical load monitoring through phone.pdf - Submitted Version Download (1MB) |
Abstract
The cost of utility bill has increased every year especially electricty bill. The consumption of the electricity in domestic house can only be monitored through the meter or TNB apps. However, the details of each load that connects to the house is not known. The purpose of this project is to evaluate the consumption of a single appliances in a house. This projects can be divided into two phase. In the first phase, the load needs to be determine using Arduino Uno. In this phase, the electrical parameters gathered from arduino will be used to determine the power consumed by the load. In the second phase, the power information from arduino will be send to the phone. In this phase, the communication between arduino and the phone is accomplished by GSM module. The result shows that when the electric consumption can be monitored real time with this project. The delay for the message to get through to the phone will take 5 seconds. The accuracy of this monitoring device is 78%. This project will help the user to save monitor and take neccesary action to manage their electric consumption.
Item Type: | Final Year Project (Project Report) |
---|---|
Uncontrolled Keywords: | Arduino Uno, Single appliances, Electrical load |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Divisions: | Library > Final Year Project > FTKEE |
Depositing User: | Sabariah Ismail |
Date Deposited: | 05 Apr 2024 07:14 |
Last Modified: | 18 Nov 2024 23:31 |
URI: | http://digitalcollection.utem.edu.my/id/eprint/31107 |
Actions (login required)
![]() |
View Item |