Mohd Adam, Norfatin Nabila (2019) The Impacts of supply chain management on employee’s hypermarket performance case study at Mydin USJ 1 Subang Jaya Selangor. Project Report. Universiti Teknikal Malaysia Melaka, Melaka, Malaysia. (Submitted)
Text (24 Pages)
The Impacts Of Supply Chain Management On Employee’s Hypermarket Performance Case Study At Mydin USJ 1 Subang Jaya Selangor.pdf - Submitted Version Download (792kB) |
|
Text (Full text)
The Impacts of supply chain management on employee’s hypermarket performance case study at Mydin USJ 1 Subang Jaya Selangor.pdf - Submitted Version Restricted to Registered users only Download (1MB) |
Abstract
Supply chain management in business project often suffer from poor performance such as project delayed, cost overruns, and quality defects. The major reason for the occurrence of poor performance comes from the deterioration of supply chain management. Delays, cost over budget, failure of a building, poor quality and others was caused by the poor performance of operating staffs and labours. The objective of this research is to determine significantly the relationship between impact supply chain on employee’s performance in Hypermarket Mydin at Subang Jaya Selangor. The literature reviews have emphasis in detail about the literature review on supply chain management practice aspects that employee’s hypermarket performance. This research was conducted by collecting data through respondent from employee’s in hypermarket Mydin. Both questionnaires were used for data collection. After that, the data and information was analyzed by using SPSS version 23. Descriptive statistical analysis which Pie Chart were conducted to describe the respondents besides multiple linear regression, t-test analysis was used to determine the relationship among variables. Lastly, conclusions and recommendations have been done. In addition, further study is needed so the effect of SCM on employee’s performance by emerging the key indicator of optimum performance by implementing the SCM in Malaysia business industry can be achieved.
Item Type: | Final Year Project (Project Report) |
---|---|
Uncontrolled Keywords: | Employees, Rating of supply chain management, Employee’s performance, Impact supply chain, Impact employee’s |
Subjects: | H Social Sciences > HD Industries. Land use. Labor |
Divisions: | Library > Final Year Project > FPTT |
Depositing User: | Sabariah Ismail |
Date Deposited: | 09 Mar 2021 02:10 |
Last Modified: | 22 Feb 2024 03:18 |
URI: | http://digitalcollection.utem.edu.my/id/eprint/24954 |
Actions (login required)
View Item |